For those who are engaged in developing power plants, I would like to share the following points with regard to the above subject. Best regards.
Electricity Condition
Demand
for electricity in West Sulawesi is supplied by 2 isolated systems
namely Pasangkayu and
Mamasa Systems. Peak utilization in 2011 reached 30 MW. Total installed capacity of power plants in West Sulawesi up
to 2011 was 6.49 MW, all Diesel Power Plants. In 2011 total electricity sale for West
Sulawesi reached 152 GWh.
Energy Potentials
West
Sulawesi has thermal potentials estimated at 545 Mwe, scattered in 6 locations namely Mambosa,
Somba, Mamasa, Lilli, Riso, and Alu, as well as hydro potentials of 800 MW namely
Karama-I.
Electricity Demand Estimate
It is
projected that demand for electricity in West Sulawesi for the period 2012-2031 shall grow averagely
by 13.0% per year so that in 2031 electricity need is
expected to reach 1.7 TWh. To fulfill peak utilization growth of averagely 12.7% per year
until 2031, then additional power of averagely 24 MW per year shall be needed.