For those who are engaged in developing of power plants, I would like to share the following points with regard to the above subject. Warm regards.
Electricity Condition
Electricity
system in West Nusa Tenggara consists of some isolated systems
namely Lombok, Sumbawa, and Bima Systems. Peak utilization in 2011 reached
186,81 MW. Total installed capacity of power plants in West Nusa Tenggara up to 2011 was 288.70
MW consisting of Diesel Power Plants 287.32 MW, Mini Hydro Power Plants 0,92 MW,
Micro Hydro Power
Plants 0.20 MW, and Solar Power Plants 0.26 MW. In 2011 total electricity sale for West Nusa
Tenggara was 837 GWh.
Energy Potentials
West Nusa
Tenggara has thermal potentials of 195 MWe in 3 locations namely Sembalun, Marongge, and Daha.
Electricity Demand Estimate
It is
projected that demand for electricity
in West Nusa Tenggara for the
period
2012-2031 shall grow averagely by 12.5% per year so that in 2031 electricity
need is expected to reach
8.6 TWh. To fulfill
peak utilization growth of averagely 12.2% per
year until 2031, then additional power of averagely
124 MW per year shall be needed.