For those who are interested in developing power plants in Banten, I would like to share the following points with regard to the above subject. Best regards.
Electricity Condition
Electricity system of Banten constitutes part of Java-Bali 500 kV and 150 kV interconnection
transmission systems. Other than that, electricity need of Banten is supplied by local Steam and Steam Gas Power Plants. Peak
utilization in 2011
reached 2,168.09 MW. Total installed capacity of power plants in Banten up to 2011
was 6,080 MW consisting of Steam Power Plants 5,340 MW and Steam Gas
Power Plants 740 MW. Total electricity sale for Banten in 2011 was 7,274 GWh.
Banten has thermal
potentials estimated
to reach 613 Mwe, scattered in 5 locations namely Rawa Dano, G Karang, G Pulosari, G Endut, and Pamancalan. Coal
potentials are estimated to reach 18.80 million tonnes.
Electricity Demand Estimate
It is projected
that demand for electricity in Banten for the period 2012-2031 shall grow averagely by 7.8%
per year so that in 2031
electricity need is expected to reach 32.5
TWh. To fulfill peak
utilization growth of averagely
7.5% per year until 2031,
then additional power of averagely
521 MW per year shall be needed.