For those who are interested in developing power plants in West Java, I would like to share the following points with regard to the above subject. Warm regards.
Electricity Condition
Electricity system of West Java constitutes part of Java-Bali interconnection system.
The main supply for electricity need of West Java other than from the Java-Bali
500 kV and 150 kV transmission systems is from Hydro Power Plants Saguling and
Cirata. Peak utilization in 2011 reached 5,515.46 MW.
Total installed capacity of power
plants in West Java up to 2011 was 6,615.23 MW consisting of Steam Power Plants 1,650 MW, Gas Power
Plants 1,534 MW, Steam
and Gas Power Plants 1,014
MW, Diesel Power Plants 0.20 MW, Hydro Power Plants 1,331.86 MW, Mini Hydro Power
Plants 0.50 MW, Micro Hydro
Power Plants 1,67 MW, Thermal Power Plants 1,057
MW, and Solar Power Plants 26 MW. Total
electricity sale for West Java in
2011 was 34,054
GWh.
Energy Potentials
West Java has diversified
energy potentials for power plants
consisting of hydro, oil, natural gas, thermal, and coal bed methane.
Hydro potentials are estimated to reah 2,137.5 MW in 5 locations namely Cibareno-1, Rajamandala, Jati Gede, Upper
Cisokan-PS, and Grindulu-PS-3. Oil potentials are estimated to reach 599.4
MMSTB and natural gas are
expected to reach 4.24 TSCF.
Thermal
potentials are estimated to reach 5,839 Mwe, scattered in 40 locations namely K Ratu
(Salak), Kiaraberes (Salak), Awi Bengkok, Ciseeng, Bujal Jasinga, Cisukarame,
Selabintana, Cisolok, G Pancar, Jampang, Tanggeung-Saguling, Cilayu, Kawah
Cibuni, G Patuha, K Ciwidey, Maribaya, Tangkubanperahu, Sagalaherang, Ciarinem,
G Papandayan, G Masigit–Guntur, Kamojang, Darajat, G Tampomas, Cipacing, G Wayang–Windu, G
Telagabodas, G Galunggung, Ciheuras, Cigunung, Cibalong, G Karaha, G Sawal,
Cipanas–Ciawi, G Cakrabuana, G Kromong, Sangkanurip, Subang, and Cibingbin. Coal bed
methane potentials are
estimated to reach 0.8 TCF.
Electricity Demand Estimate
It is projected
that demand for electricity
in West Java for the period
2012-2031 shall grow averagely by 8.7% per year so that in 2031 electricity
need is estimated to reach
176.7 TWh. To fulfill
peak utilization growth of averagely around 8.4% per year until 2031, then additional
power of averagely around 1,626 MW
per year shall
be needed.