For those who are engaged in developing power plants, I would like to share the following points with regard to the above subject. Warm regards.
Electricity Condition
Demand
for electricity in Gorontalo is supplied by some isolated systems
namely Telaga,
Buruki, and Marisa Tilamuta Systems. Peak utilization in 2011 reached 49.63 MW. Total installed capacity of power plants in Gorontalo up to 2011
was 62.20 MW consisting of Diesel Power Plants 60.70 MW and Mini Hydro Power Plants 1.50 MW. Total electricity sale for Gorontalo
in 2011 reached 237 GWh.
Energy Potentials
Gorontalo has thermal
potentials of 185 MWe in 2 locations namely Petandio and
Suwawa.
Electricity Demand Estimate
It is projected
that demand for electricity
in Gorontalo for the period
2012-2031 shall grow averagely by 12.1% per year so that in 2031 electricity
need is expected to reach 2.2 TWh.
To fulfill peak utilization growth of averagely
around 11.8% per year until 2031, then additional power of averagely
around 33 MW per year shall be needed.