Current Electricity Condition
Sumatera Power Distribution and Transmission Center (SPDTC) supplies most of  Aceh electricity need through 150 kV transmission network and the rest is supplied by those isolated system power plants managed by Aceh Region of State Electricity Enterprise. In 2011 peak utilization in Aceh System was around 322.68 MW.

Total installed capacity of Aceh power plants up to 2011 was 463,52 MW consisting of Steam Power Plants for 15 MW, Diesel Power Plants for 446.67 MW, Hydro Power Plants for 1.75 MW, and Micro Hydro Power Plants for 0.10 MW. Total electricity sale of Aceh in 2011 was 1,580 GWh.

Energy Potentials
Aceh has diversified energy resource potentials for power plants consisting of hydro, thermal, oil, gas, and coal. Hydro power potentials are estimated to reach 1,655.1 MW, scattered in 18 locations namely Jambo Papeun-3, Woyla-2, Teunom-2, Teunom-3, Kluet-1, Kluet-3, Meulaboh-2, Meulaboh-5, Ramasan-1, Sibubung-1, Sibubung-3, Seunangan-3, Teripa-4, Tampur-1, Teunom-1, Peusangan-1-2, Peusangan-4, and Lawe Mamas.

Thermal power potentials are estimated to reach 1,232 Mwe, scattered in 16 locations namely Lho Pria Laot, Jaboi, Ie Seum - Krueng Raya, Seulawah Agam, Alur Canang, Alue Long – Bangga, Tangse, Rimba Raya, G Geureudong, Simpang Balik, Silih Nara, Meranti, Brawang Buaya, KafI, G Kembar, and Dolok Perkirapan. Oil potentials are estimated to reach 121.65 MMSTB, gas 5.56 TSCF, and coal 450.15 million tonnes.  

Electricity  Demand Estimate  

It is projected that demand for electricity for the period 2012-2031 shall grow averagely around 19.7% per year so that in 2031 electricity need is expected to reach 55.6 TWh. To fulfill estimated peak utilization growth of averagely around 19.4% per year until 2031, then additional power of averagely around 741 MW per year shall be needed.  