Current Electricity Condition
Sumatera Power Distribution and Transmission
Center (SPDTC) supplies most of Aceh electricity need
through 150 kV transmission network and the rest is supplied by those isolated
system power plants managed by Aceh Region of State Electricity Enterprise.
In 2011 peak utilization in Aceh System was around 322.68 MW.
Total installed capacity of
Aceh power plants up
to 2011 was 463,52 MW consisting of Steam Power Plants for 15 MW, Diesel
Power Plants for 446.67 MW, Hydro Power Plants for 1.75 MW, and Micro Hydro Power
Plants for 0.10 MW. Total electricity
sale of Aceh in 2011 was 1,580
GWh.
Energy Potentials
Aceh has diversified energy
resource potentials for
power plants consisting of hydro, thermal, oil, gas, and coal. Hydro power potentials
are estimated to reach 1,655.1 MW, scattered in 18 locations namely Jambo Papeun-3, Woyla-2, Teunom-2, Teunom-3, Kluet-1, Kluet-3, Meulaboh-2, Meulaboh-5, Ramasan-1, Sibubung-1, Sibubung-3,
Seunangan-3, Teripa-4, Tampur-1, Teunom-1, Peusangan-1-2, Peusangan-4, and Lawe Mamas.
Thermal power potentials
are estimated to reach 1,232 Mwe, scattered in 16 locations namely Lho Pria Laot, Jaboi, Ie Seum -
Krueng Raya, Seulawah Agam, Alur Canang, Alue Long – Bangga, Tangse, Rimba
Raya, G Geureudong, Simpang Balik, Silih Nara, Meranti, Brawang Buaya, KafI, G
Kembar, and
Dolok Perkirapan. Oil potentials
are estimated to reach 121.65 MMSTB, gas 5.56 TSCF, and coal 450.15 million tonnes.
Electricity Demand Estimate
It
is projected that demand for electricity
for the period 2012-2031 shall grow averagely around 19.7% per year
so that in 2031 electricity need is expected to reach 55.6 TWh. To fulfill estimated
peak utilization growth
of averagely around 19.4% per year until 2031, then additional power of averagely
around 741 MW per year shall be needed.